Version 03.14.
  • Many small bug fixes and improvements.
Version 03.13.
  • Functions ‘Displace right’, ‘Displace left’, ‘Stretch’ and ‘Shrink’ work now properly with working and calendar days, and with any scale: days, weeks, months and years.
Version 03.12.
  • Bug fix: pop-up messages were showing wrong texts, not linked to the functions. This issue has been fixed.
Version 03.11.
  • ‘Performance’ function can now be used with a group of tasks simultaneously.
  • ‘First day’ function works now with any selected group of tasks.
Version 03.10.
  • New pop up window with instructions when importing tasks (function: ‘Import’).
  • Bug fix: improved performance of the function ‘First day’
  • Bug fix: dates format fixed when using the option ‘Best scale’.
Version 03.09.
  • ‘Task Duration’ function can now be used with a group of tasks.
  • When using the ‘First Day’ it is not longer neccesary that the first task is located on top of the schedule.
  • Picking the task color for a group of tasks is now much faster.
  • A pop-up message shows the ‘Best Scale’ calculated when using this function.
  • Several bug fixes and improvements.
Version 03.08.
  • ‘Reschedule’ and ‘First Day’ options work now with both working/calendar days, depending on your choice.
  • Bug fix: some functions were not working properly when selecting the option ‘Single Click’.
Version 03.07.
Bug fix: export and print options working again when the license has expired.
Version 03.06.

Importing tasks from another schedule created with Friendly Schedule is now possible with the function “‘Import’“. If you have schedules on old versions of Friendly Schedule that have already expired, and you need to keep on working with them, use this option and bring the tasks to a new schedule.

  • Open the old and new schedules.
  • Go to the new schedule and click on ‘Import’ to enable the Copy/Paste option.
  • Go the old schedule and Copy the tasks you need, including all the columns (A to G).
  • Go to the new schedule and Paste the tasks where you need them.
Version 03.05.
  • ‘Task Pilot’ function has been replaced by direct options on the menu: displace left, displace right, stretch and shrink tasks just with one click.
  • An option to change the first day of the schedule has been added, which allows rescheduling all the tasks automatically.
Version 03.04.
Bug fixes and functionality improvements.
Version 03.03.
New ‘Task Pilot’ to update tasks easily — FUNCTION DEPRECATED AFTER VERSION 03.05 —

Version 03.02.
Optimized scales for your schedules: daily, weekly, monthly, yearly and custom scale. The Date Header is adjusted automatically to the selected scale.

Version 03.01.
Option to hide the schedule’s bars on weekends and holidays (option available in the ‘Preferences’ menu).

Version 03.00.
The generation of the schedule is now automatic when entering tasks, so clicking on the old calculation button is not necessary. In case the schedule is not updated automatically in a specific operation, just click on ‘Refresh schedule’:

All the preferences have been put together and are available in the top menu:



Use the preferences menu to:

  • Select the style of your schedule: solid bars, gradient, tubes, stripes, etc.
  • Enable/disable the grid.
  • Show and hide columns.
  • Enable/disable project tracking.
  • Highlight or not the first day of each month on the calendar.
  • Select working or calendar days for calculation.
  • Select if you want to include in the print area the scale and the reference date.
If you select ‘Working days’ in the option ‘Days count’, the duration and performance of the tasks will only take into consideration working days. In case you choose ‘Calendar days’, both duration and performance will be calculated with all the calendar days.

To design your calendar, click first on the option ‘Working days’, to select working day or weekend for each day of the week.


Click on ‘Holidays’ to select local holidays for your calendar, with the help of a friendly ‘Date Picker’.

Just click on the dates that you want to consider as holidays for the calculation of the duration and performance of the tasks.

For deleting all the local holidays added to the calendar, use the option ‘Delete Local Holidays’, available at the menu ‘Working days’.

The option to translate terms is also located at the top menu:


If you are not familiar with Friendly Schedule’s functions, click on ‘Example’ to load a test schedule.

My schedule has expired!

Posted on

Friendly Schedule is under constant development and regularly updated, so the expiration date might show up when working on a schedule. Do not worry, version 3.06 and later versions include the option ‘Import’, which allows transferring tasks from older schedules.

Click below to learn how to use the function ‘Import’.

Importing tasks from other schedules

Posted on

Function ‘IMPORT’

Version 3.06 and later versions include the function ‘Import’, which allows copying tasks from other schedules created with Friendly Schedule:

  • Download a new version of Friendly Schedule if you do not have version 3.06 or a later one.
  • Open the new version and create a new schedule (book 1).
  • Click on the option ‘Import’ to enable Copy/Paste.
  • Go to the old schedule (book 2) that contains the tasks that you want to transfer and EXPORT it, using the option ‘Export’ located on the top menu.
  • You cannot copy the tasks directly from the old book, so do not forget to export it first.
  • Now the old schedule has been exported to another Excel book (book 3). Select the tasks on this book and Copy them with the usual Excel option or CTRL+c.
  • Go back to the new schedule (book 1), select the location for the tasks and Paste them (CTRL + v).
  • Now the tasks from the old schedule (book 2) have been transferred to the new one (book 1).

This option can also be used if your older schedules have expired:

  • Open your expired schedule and click on the option ‘Export’. All the information will be transferred to a new Excel workbook (book 1).
  • Download a new version of Friendly Schedule if you do not have version 3.06 or a later one.
  • Open the new version and create a new schedule (book 2).
  • Click on the option ‘Import’ to enable Copy/Paste.
  • Go the exported schedule (book 1), select the tasks that you are interested in and Copy them.
  • Go to the new schedule (book 2), select the location for the tasks and Paste them.
  • Now the tasks from the old schedule (book 1) have been transferred to the new one (book 2).

Alumnos de Tutellus

Posted on

Si eres alumno del curso de Tutellus te habrás dado cuenta de que los videos se realizaron con la versión 01.07, mientras que la versión actual del programa es muy superior. Te recomiendo que utilices siempre la versión más moderna, pero en el caso de que quieras practicar el contenido del curso, puedes descargar aquí la original.